In 2023, the VIA-VAS and PNRR-PNIEC commisions examined 221 procedures for a total of 10.5 GW of new renewable capacity
A further 12 GW (MBS estimates) of solar and wind capacity is expected by 2025, which the FitFOR55 scenario expects to grow to over 100 GW in 2030
Grid connection requests correspond to approximately 328 GW, approximately 3 times the new renewable capacity needed to achieve the objectives
In Europe, to date, PPAs have been signed for 58.9 GW, of which 38 GW corporate PPAs
Italy represents 3.2% of the European market, with 1.9 GW of PPAs, of which approximately 940 MW corporate PPAs
The lively interest on the demand side corresponds to an expected increase in the competitive supply of ready-to-build renewable projects